A406 Crooked Billet to Waterworks Corner

Case Study

Download PDF

Summary: Multiple failing hand-laid asphalt patches on the A406 North Circular replaced with a single, seamless Elastomac repair, ending the cycle of repeat patching.

40 m²repair area
2 hourson site
One visitpermanent repair
Over 90%carbon reduction

The challenge

Hand-laid patching is outdated and fails quickly on high-traffic routes like the A406.

As patches overlap, clusters of weak joints form. These let water in, leading to freeze–thaw damage and early failure. The result is repeated visits, higher costs and a network that looks poorly maintained.

The solution

Platinum 3Sixty used Roadmender Elastomac to replace the failing patches with a single permanent repair. The system:

Results

One visit, one seamless repair, and no more weak joints for water to get into.

Frequently asked questions

Where was this elastomac permanent repair carried out?

A406 North Circular Road, Crooked Billet to Waterworks Corner, London, for TKJV.

How long did the works take?

2 hours.

Why was this method used?

Platinum 3Sixty used Roadmender Elastomac to replace the failing patches with a single permanent repair. The system:

What was the result?

One visit, one seamless repair, and no more weak joints for water to get into.

Related: Elastomac permanent repairs · Climate funding guide · All case studies

Full case study (PDF)