Case Studies

Permanent, Sustainable Highway Maintenance

Our Work in Action

Explore a selection of Platinum 3Sixty projects demonstrating our expertise in permanent, low-carbon Elastomac and surfacing solutions across the UK.

A41 Brent Cross Interchange

A41 Brent Cross Interchange

Permanent Elastomac reinstatement improving durability and reducing reactive maintenance at one of London’s busiest junctions.

View Case Study
A406 Crooked Billet to Waterworks Corner

A406 – Crooked Billet to Waterworks Corner

Elastomac surface reinstatement providing zero-waste installation and long-life performance across the strategic network.

View Case Study
A406 Sterling Way Concrete Repair

A406 North Circular – Sterling Way Concrete Repair

Non-invasive Elastomac overlay protecting failing concrete slabs from water ingress and structural deterioration.

View Case Study
Eurotunnel Freight Underpass Deep Repair

Eurotunnel Freight Underpass – Deep Repair

Multi-layer Elastomac structural reinstatement delivering maximum strength in one of the UK’s busiest freight corridors.

View Case Study
Eurotunnel Pothole Repair

Eurotunnel – Pothole Repair

Permanent Elastomac pothole repairs delivering rapid-cure, zero-waste installation and 97% CO₂ savings.

View Case Study
Morrisons Welwyn Garden City

Morrisons – Welwyn Garden City

Permanent Elastomac reinstatement eliminating deep potholes in high-traffic retail areas and reducing disruption to store operations.

View Case Study
Kings Lane, Sutton – Elastomac Railway Bridge Repair

Kings Lane, Sutton – Elastomac Railway Bridge Repair

Precision reinforcement and long-life Elastomac reinstatement on a strategic railway bridge structure.

View Case Study
Fitzroy Park Elastomac Repairs London

Fitzroy Park, London – Elastomac Repairs

Permanent Elastomac reinstatement delivering long-life, low-carbon repairs at a high-value residential location in North London.

View Case Study
Green Wrythe Lane – Elastomac Road Repair Case Study

Green Wrythe Lane – Elastomac Road Repair

Fast-curing, permanent Elastomac reinstatement on a live highway with zero waste and minimal disruption.

View Case Study
Milton Keynes – Decorative Imprint Speed Table

Milton Keynes – Decorative Imprint Speed Table

Decorative imprint speed table installation delivering a durable, low-maintenance traffic calming solution with a high-quality finish.

View Case Study
Albert Bridge – Elastomac Repairs

Albert Bridge – Elastomac Structural Repairs

Permanent Elastomac repairs delivered on the historic Albert Bridge, overcoming weight restrictions and structural constraints with a zero-waste, low-carbon solution.

View Case Study
Yellow MMA Road Marking Installation at Selhurst Park

Yellow MMA Road Marking – Selhurst Park

High-performance yellow MMA road marking installation completed at Selhurst Park, Crystal Palace London, delivering durable, high-visibility markings with minimal disruption.

View Case Study
Permanent Bus Stop Surface Repair

Permanent Bus Stop Surface Repair

Durable permanent surface repair delivered for a high-traffic bus stop environment, reducing disruption while improving long-term performance.

View Case Study
High Friction Surfacing Richmond Park

High Friction Surfacing – Richmond Park

Specialist high friction surfacing works delivered at Richmond Park, improving skid resistance, safety and long-term surface performance.

View Case Study
Dickerage Lane Elastomac Repair

Dickerage Lane – Elastomac Repair

Permanent Elastomac highway repair delivering durable, low-carbon reinstatement with minimal disruption to road users.

View Case Study
A406 Expansion Joint Intervention

A406 – Expansion Joint Intervention

Specialist expansion joint intervention on the A406, protecting the carriageway and reducing future maintenance requirements.

View Case Study
© 2025 Platinum 3Sixty Ltd | All Rights Reserved | Website by NinetyFour Web Design Agency