Summary: Durable, low-profile yellow MMA markings defining no-standing areas on the stadium concourse, where thermoplastic kit could not get in.
The challenge
Spectators were gathering in an area of the stadium concourse during match days, creating a safety hazard. The club needed clear, durable markings to keep it clear.
- Restricted access prevented thermoplastic lorries and boilers entering the site
- Tight operational constraints within the stadium
- Raised markings could create trip hazards for pedestrians
- A limited working window requiring a rapid-curing system
The solution
Platinum 3Sixty installed a rapid-curing MMA marking system, ideal where access for thermoplastic equipment is restricted.
- Durable markings suited to a high-traffic stadium environment
- Low-profile finish reducing trip risk
- Completed within a tight window with no downtime for the club
Results
Clear, high-visibility markings now help the club manage crowds and keep circulation routes safe.
- MMA is the right choice where thermoplastic kit cannot get access
- Low-profile markings suit pedestrian-heavy areas
- Rapid cure lets work fit around a live venue
Frequently asked questions
Where was this mma road marking carried out?
Selhurst Park Stadium, London, for Crystal Palace FC.
How long did the works take?
One shift.
Why was this method used?
Platinum 3Sixty installed a rapid-curing MMA marking system, ideal where access for thermoplastic equipment is restricted.
What was the result?
Clear, high-visibility markings now help the club manage crowds and keep circulation routes safe.
Related: Elastomac permanent repairs · Climate funding guide · All case studies
Full case study (PDF)
Project Overview
Platinum 3Sixty completed a specialist yellow MMA road marking installation at Selhurst Park, Crystal Palace London, delivering durable, high-visibility markings suitable for high-traffic urban environments.
Using premium MMA road marking systems, the installation provided rapid curing, excellent adhesion and long-term performance while minimising disruption to surrounding traffic and site operations.
Key Benefits
Rapid Installation
Fast-curing MMA systems reduced downtime and disruption.
High Visibility
Bright yellow markings improved safety and visibility.
Long-Life Performance
Durable highway-grade materials designed for demanding environments.
Professional Finish
Clean application delivered a high-quality finished appearance.
Before & After