Climate funding support · How-to guide for highway authorities

How to fund permanent pothole repairs from climate and carbon budgets

A practical, step-by-step guide based on the Kingston and Sutton Elastomac programme, where a measured carbon saving helped the council make the case for more funding.

The short answer: yes, councils can use climate, sustainability or carbon offset budgets for road repairs, as long as the repair delivers a measurable, auditable carbon saving compared with the council's normal method.

The case is built on the whole job (materials, plant, haulage, waste, traffic management and every repeat visit) and is usually judged as capital cost per tonne of CO₂ saved over the project's life. There is no single national pot: the route is to match a well-evidenced scheme to a live local fund.

Case study: Kingston and Sutton

The Kingston and Sutton Shared Environment Service manages highways for both boroughs. Its experience shows how a maintenance method can open a different budget conversation.

  1. 2024: trial. The Royal Borough of Kingston trialled Elastomac and, after a successful trial, moved to using it across the borough. The council describes it as cost-effective, long lasting and more environmentally friendly, with roads reopening around 30 minutes after application.
  2. Extended to Sutton. The shared service extended the method to the London Borough of Sutton, which describes it as significantly better for the environment, with no planing and zero waste road material.
  3. By June 2025: 5,285 m² treated in Kingston and 1,779 m² in Sutton, according to each council's published highways information.
  4. June 2025: the funding bid. The highways team asked us for the detail behind our carbon calculations to support a bid for more funding. We supplied a calculation pack for a 5,500 m² programme comparing conventional repairs with Elastomac, with every source listed.
  5. Outcome. The bid was successful and additional funding was allocated to the programme.
  6. Evidence that keeps working. Our return-visit case studies, including Dickerage Lane and the Kings Lane railway bridge, give the councils photographic proof of how the repairs perform, which they can use in their highways reporting.

The lesson is simple: a carbon saving that is measured, specific to the sites and backed by follow-up evidence gives a budget holder something they can approve.

Step by step: how to get a scheme funded

The contractor can provide the evidence; the authority needs an internal sponsor and a route into the right budget.

  1. Build a defect-led work bank

    List the sites where repairs keep failing: repeat potholes, failed joints, alligator cracking, bus stops and other high-stress areas. Record the area, defect type and how many times each site has been revisited.

  2. Define the conventional comparator

    Write down what you would normally do at each site: the excavation depth, materials, plant, waste and traffic management, and how often the repair has to be repeated. A climate case is always a comparison, so the baseline must be your real method, not a worst case.

  3. Calculate whole-life carbon for both options

    Count materials, plant fuel, haulage, waste disposal, traffic management and every repeat visit over the same appraisal period. Use the current UK Government greenhouse gas conversion factors (the 2026 set was published by DESNZ in June 2026) and record the version you used.

  4. Express the saving the way funders assess it

    Show the lifetime tonnes of CO₂e saved and the capital cost per tonne saved (£capex/tCO₂ lifetime). This is the measure councils such as Kingston use to assess carbon offset fund projects, and it lets a road repair be compared fairly with insulation or solar schemes.

  5. Find the budget owner and a live fund

    Map the project to the council's climate action plan, then speak to the climate or sustainability lead. Ask about carbon offset funds, sustainability or innovation budgets, and whether highways maintenance capital can carry the lower-carbon option. Check the fund's eligibility and closing date before you commit the scheme.

  6. Confirm the procurement route

    Climate money is not a procurement exemption. Ask your commercial or procurement team how a defined, specialist low-carbon scheme should be delivered: through your term contractor, an existing support contract or a separate quotation or tender.

  7. Submit a short business case

    One or two pages: the problem, the sites, the conventional method, the lower-carbon method, lifetime tCO₂e saved, £ per tonne, programme, procurement route and how results will be reported.

  8. Deliver and record the evidence

    Record actual areas, materials, plant movements, traffic management time, waste avoided and reopening times, with photographs before and after every repair.

  9. Return to site and report the outcome

    Revisit the same locations at around 12 months and beyond, photograph them from the same positions and report the result. Good follow-up evidence makes the next funding round much easier to approve and can feed your highways transparency report.

Where can the money come from?

There is no single UK "climate fund" for roads. These are the routes worth testing, roughly in order of how often they work.

SourceHow it worksWhat to check
Highways maintenance capitalThe Government has confirmed £7.3bn of local highways maintenance funding for 2026/27 to 2029/30. Part of each council's allocation is an incentive element linked to publishing a transparency report, and DfT is pushing authorities towards more preventative maintenance.Whether the lower-carbon option can be carried in the existing programme, with the carbon outcome tracked separately.
Council climate or sustainability budgetsInternal allocations set against the council's climate action plan.Who owns the budget, what outcomes it must show and when bids are decided.
Section 106 carbon offset fundsIn London, developments that miss net zero on site pay into the borough's ring-fenced carbon offset fund. The Mayor's recommended price is £95 per tonne over 30 years.Local priorities (many favour building retrofit), the £/tCO₂ test and how projects are bid for.
Local Transport GrantA consolidated DfT capital grant for local transport maintenance and enhancements, allocated for 2026/27 to 2029/30.Eligibility under the grant conditions and local priorities.
Innovation, resilience or external grantsRounds that open and close, sometimes covering highways or circular-economy projects.Whether highway maintenance is eligible and the closing date.
Private estates and infrastructurePorts, retailers, estates and academy trusts can build an internal whole-life carbon or ESG capital case.The organisation's own carbon targets and reporting.

What makes a carbon case fundable

  • A defined work bank: named sites, areas and defect types.
  • An honest comparator: your real conventional method, including repeat visits.
  • A transparent calculation: system boundary, quantities, distances, plant hours, disposal, traffic management, service life and the emission factors used.
  • Both views of carbon: the first installation and the whole-life or annualised figure, so a longer-lasting repair is not penalised.
  • Cost per tonne saved over the appraisal period.
  • A reporting plan: before, after and same-location return photographs.

Our starting model

Our original Kingston and Sutton model compared 31.2 kg CO₂e per m² per year for repeated temporary "throw and go" patching (two visits a year) with 0.825 kg CO₂e per m² per year for Elastomac (one intervention every four years): around a 97% reduction on those assumptions. Elastomac is laid without planing or excavation, so there is no spoil to haul away, and it contains recycled tyre rubber.

Every funding calculation we provide is re-run for the client's own sites, repair history and the current UK Government conversion factors. Headline percentages are a starting point, not a substitute for a site-specific calculation.

What to avoid

  • Treating climate money as a way round your term maintenance contract. Funding and procurement are separate decisions.
  • Splitting a known programme into small orders to stay under a procurement threshold.
  • Relying on a generic headline figure instead of a site-specific calculation.
  • Promising a named grant before you have checked it is live and that highways work is eligible.

Common questions

Can councils use climate budgets to pay for pothole repairs?

Yes, where the repair delivers a measurable, auditable carbon saving compared with the council's normal method and fits the rules of the fund. The money is not for pothole repair as such; it pays for the carbon reduction, so the case has to show the whole-job comparison and a cost per tonne of CO₂ saved.

How much climate funding can a council get?

There is no fixed cap. The amount depends on the funding mechanism used and how much carbon the scheme measurably saves. Carbon offset funds, for example, are judged on cost per tonne of CO₂ saved, so a larger, well-evidenced programme can support a larger bid. Each fund sets its own rules, so check them before you apply.

Is there a national climate fund for pothole repairs?

Not as far as we are aware. There is no single UK grant dedicated to low-carbon pothole repair. The usual route is to match a measurable carbon-saving maintenance scheme to a live local source, such as a council climate or sustainability budget, a Section 106 carbon offset fund or a capital or innovation allocation.

What is a carbon offset fund?

In London, major developments that cannot meet net zero carbon on site pay into the local planning authority's carbon offset fund through a Section 106 agreement. The money is ring-fenced for climate-related projects. The Mayor recommends a price of £95 per tonne of CO₂ over 30 years, and London boroughs had secured around £380m in total by the GLA's latest monitoring report.

How is a carbon-saving project assessed?

Typically by capital cost per tonne of CO₂ saved over the project's lifetime (£capex/tCO₂ lifetime), alongside wider benefits. A long-lasting repair that avoids repeat visits, excavation and waste can score well because the saving starts as soon as the repair is laid.

How much carbon can a permanent repair save?

It depends on the site and the method it replaces. Our original Kingston and Sutton model compared 31.2 kg CO₂e per m² per year for repeated temporary patching (two visits a year) with 0.825 kg CO₂e per m² per year for Elastomac (one intervention every four years), a reduction of around 97% on those assumptions. For any funding bid we recalculate from your own sites, repair history and the current government conversion factors.

How long is climate funding available?

There is no universal end date. Council budgets are usually set annually or over a few years, carbon offset funds depend on developer contributions, and external grants open and close in rounds. Always check the live fund, its eligibility rules and its closing date first.

Does climate funding mean we can bypass our term maintenance contract?

No. Funding and procurement are separate decisions. The funding case shows why the scheme is worth doing; your commercial team then confirms the compliant delivery route.

What does Platinum 3Sixty provide?

A site-by-site carbon comparison against your normal method, a calculation pack showing every assumption and source, relevant case studies, delivery with full photographic records, and return visits to evidence how the repairs have performed. We do not charge for an initial conversation about whether your sites are a good fit.

Want to do the same?

Send us a list of your problem sites. We'll compare them with your normal method and show you the carbon saving and cost per tonne.