Kings Lane, Sutton – Elastomac Railway Bridge Repair

Case Study

Summary: Repeatedly failing patches on King's Lane railway bridge replaced with a flexible, waterproof Elastomac repair that moves with the structure.

340 m²repair area
2 nightsdelivery
Over 10 tCO₂e saved
10.5 monthsfollow-up evidence

The challenge

Patches on the bridge kept failing, and every return visit added cost, carbon and traffic disruption.

The solution

Elastomac was installed as a single-visit permanent repair over two night shifts:

Results

Using Elastomac instead of throw-and-go patching saved over 10 tonnes of CO₂e on this job alone and recycled the equivalent of three HGV loads of waste tyres into the road.

10.5 months on: still in service

The repaired carriageway remains in service about 10.5 months after installation. The repair surface appears continuous, with no obvious open joints or edge break-up, and road markings remain in service across the bridge approach.

What counts is not just how quickly a material goes down, but whether it keeps performing after the traffic management is removed. King's Lane turned a short closure window into a permanent repair instead of another patching cycle.

Frequently asked questions

Where was this elastomac bridge repair carried out?

King's Lane railway bridge, Sutton, for London Borough of Sutton.

How long did the works take?

Two nights (16–17 Oct 2025).

Why was this method used?

Elastomac was installed as a single-visit permanent repair over two night shifts:

What was the result?

Using Elastomac instead of throw-and-go patching saved over 10 tonnes of CO₂e on this job alone and recycled the equivalent of three HGV loads of waste tyres into the road.

Has the repair lasted?

The repaired carriageway remains in service about 10.5 months after installation. The repair surface appears continuous, with no obvious open joints or edge break-up, and road markings remain in service across the bridge approach.