Summary: Repeatedly failing patches on King's Lane railway bridge replaced with a flexible, waterproof Elastomac repair that moves with the structure.
The challenge
Patches on the bridge kept failing, and every return visit added cost, carbon and traffic disruption.
- Patches fail quickly because of bridge movement and vibration
- Poor bonding to concrete or waterproofed deck surfaces
- Water ingress at joints leads to rapid breakdown
- Heavy plant access and lane closures are difficult on bridges
- Multiple patches accelerate deterioration and look poor
The solution
Elastomac was installed as a single-visit permanent repair over two night shifts:
- Seals edges and forms a fully waterproof repair, protecting the bridge structure
- Recycled tyre rubber lets the repair flex with thermal movement and vibration
- No repeat patching – lower labour, plant and traffic management costs
- Cures in minutes, minimising closures
- A clean, consistent finish that protects asset value and inspection scores
Results
Using Elastomac instead of throw-and-go patching saved over 10 tonnes of CO₂e on this job alone and recycled the equivalent of three HGV loads of waste tyres into the road.
- Delivered over two nights, with outputs of up to 200 m² per shift
- Added waterproofing protection to the bridge deck
- A permanent alternative to repeat patching on a moving structure
10.5 months on: still in service
The repaired carriageway remains in service about 10.5 months after installation. The repair surface appears continuous, with no obvious open joints or edge break-up, and road markings remain in service across the bridge approach.
What counts is not just how quickly a material goes down, but whether it keeps performing after the traffic management is removed. King's Lane turned a short closure window into a permanent repair instead of another patching cycle.
Frequently asked questions
Where was this elastomac bridge repair carried out?
King's Lane railway bridge, Sutton, for London Borough of Sutton.
How long did the works take?
Two nights (16–17 Oct 2025).
Why was this method used?
Elastomac was installed as a single-visit permanent repair over two night shifts:
What was the result?
Using Elastomac instead of throw-and-go patching saved over 10 tonnes of CO₂e on this job alone and recycled the equivalent of three HGV loads of waste tyres into the road.
Has the repair lasted?
The repaired carriageway remains in service about 10.5 months after installation. The repair surface appears continuous, with no obvious open joints or edge break-up, and road markings remain in service across the bridge approach.