Eurotunnel Freight Underpass

Case Study

Summary: A row of failed asphalt repairs in Eurotunnel's freight underpass replaced with a deep, watertight Elastomac repair, ending constant re-patching.

12 m²deep repair
1 dayon site
Heavy HGVfreight route
Over 90%carbon reduction

The challenge

The Eurotunnel freight underpass carries huge volumes of HGVs every year, causing rapid deterioration. Previous surface repairs failed quickly, leading to constant re-patching.

Deep concrete or asphalt repairs were not practical because of the excavation, curing times and disruption involved. A heavy-duty polymer-modified asphalt resurfacing would cost more, create more carbon and still not perform as well.

The solution

We carried out a deep, permanent repair using Roadmender Elastomac in a single day on site. This approach:

Results

One day on site replaced a cycle of failing patches with a seamless, watertight repair built for continuous HGV loading.

Frequently asked questions

Where was this elastomac deep repair carried out?

Freight underpass, Folkestone terminal, for The Channel Tunnel Group (Eurotunnel).

How long did the works take?

1 day.

Why was this method used?

We carried out a deep, permanent repair using Roadmender Elastomac in a single day on site. This approach:

What was the result?

One day on site replaced a cycle of failing patches with a seamless, watertight repair built for continuous HGV loading.