Summary: A durable, high-grip surfacing upgrade at a main Richmond Park entrance, delivered around vehicles, cyclists, pedestrians, horses and free-roaming deer.
The challenge
The works were at a main Richmond Park entrance with high vehicle flows and limited space.
- Heavy pedestrian and cyclist traffic needing safe diversions
- Free-roaming deer crossing the carriageway during operations
- Strict environmental controls to protect wildlife and park users
- Limited working space requiring tight traffic management
The solution
We selected a durable MMA high friction surfacing system suited to a high-traffic park entrance and delivered it in one shift:
- Phased traffic management with safe pedestrian and cyclist diversions
- Environmental controls maintained to protect roaming deer and park users
- Surface prepared and primed for a strong bond and long life
- Installed efficiently to minimise disruption
Results
The entrance now has a safe, level, high-texture surface built for heavy traffic, with trip hazards removed.
- Access constraints at high-profile park entrances directly influence material selection, so flexibility in specification is essential
- Early coordination with the client makes sure substrate repairs support the final surfacing
- MMA systems perform well in restricted or sensitive environments where hot-applied systems are not suitable
Frequently asked questions
Where was this high friction surfacing carried out?
Richmond Park main entrance, London.
How long did the works take?
One shift.
Why was this method used?
We selected a durable MMA high friction surfacing system suited to a high-traffic park entrance and delivered it in one shift:
What was the result?
The entrance now has a safe, level, high-texture surface built for heavy traffic, with trip hazards removed.
Related: Elastomac permanent repairs · Climate funding guide · All case studies
Full case study (PDF)
Project Overview
Platinum 3Sixty delivered specialist high friction surfacing works at Richmond Park, improving skid resistance, safety and surface performance in a sensitive and high-profile location.
The works were completed using a durable surfacing system designed to improve grip and provide a clean, long-lasting finish while keeping disruption to a minimum.
Key Benefits
Improved Skid Resistance
High friction surfacing helps improve grip and road user safety.
Durable Finish
Long-life surface treatment designed for demanding highway environments.
Safety Focused
Ideal for areas where braking, turning and surface grip are critical.
Minimal Disruption
Efficient installation helped reduce impact on the surrounding location.
Before & After