Summary: An early-stage Elastomac intervention on the A41 Brent Cross Interchange, sealing reflective cracks in the wheel track before they could develop into larger, costly failures.
The challenge
The A41 Brent Cross Interchange was showing signs of reflective cracking in the wheel track. Left untreated, those cracks would let water in and develop into larger failures, ending in costly and disruptive full resurfacing at one of London's busiest junctions.
TKJV wanted a proactive, sustainable intervention that would extend the life of the carriageway and keep disruption to a minimum at this critical location.
The solution
Platinum 3Sixty carried out an early-stage intervention using Roadmender Elastomac, a hot-applied permanent repair system designed to seal cracks and defects before they escalate. The trial showed how Elastomac:
- Provides a long-term, resilient repair at the crack stage
- Prevents water ingress and further structural deterioration
- Delays or removes the need for full resurfacing
- Goes down quickly, with minimal traffic disruption
- Incorporates recycled rubber from end-of-life tyres
Results
Sealing the cracks early stopped the deterioration at the cheapest possible point, protecting the carriageway and pushing back the need for resurfacing.
- Early-stage intervention proved highly effective at stopping deterioration
- Rapid installation reduced disruption for road users
- The quality of finish exceeded expectations
Frequently asked questions
Where was this elastomac crack sealing carried out?
A41 Brent Cross Interchange, London, for TKJV.
How long did the works take?
2 hours.
Why was this method used?
Platinum 3Sixty carried out an early-stage intervention using Roadmender Elastomac, a hot-applied permanent repair system designed to seal cracks and defects before they escalate. The trial showed how Elastomac:
What was the result?
Sealing the cracks early stopped the deterioration at the cheapest possible point, protecting the carriageway and pushing back the need for resurfacing.
Related: Elastomac permanent repairs · Climate funding guide · All case studies