Morrisons – Welwyn Garden City

Case Study

Summary: A deep pothole and failed joint on a busy supermarket access road permanently repaired, with lining reinstated, during trading hours.

34 m²repair area
3 hourson site
Zeroclosures
Same visitlining reinstated

The challenge

Busy retail access roads take constant vehicle loading, HGV turning forces and have few maintenance windows, so potholes keep coming back. Most asphalt contractors won't guarantee pothole repairs, which means repeated spend and closures.

The solution

We applied the Elastomac hot-applied permanent repair system to both the pothole and the joint failure.

Results

The client prefers a permanent repair to temporary patching – and got one without closing the store.

Frequently asked questions

Where was this elastomac permanent repair carried out?

Morrisons, Welwyn Garden City, for Associated Asphalt.

How long did the works take?

About 3 hours.

Why was this method used?

We applied the Elastomac hot-applied permanent repair system to both the pothole and the joint failure.

What was the result?

The client prefers a permanent repair to temporary patching – and got one without closing the store.