Summary: A deep pothole and failed joint on a busy supermarket access road permanently repaired, with lining reinstated, during trading hours.
The challenge
Busy retail access roads take constant vehicle loading, HGV turning forces and have few maintenance windows, so potholes keep coming back. Most asphalt contractors won't guarantee pothole repairs, which means repeated spend and closures.
- Deep pothole and failed longitudinal joint causing disruption and a safety risk
- Work had to be done during daytime trading hours
- Live customer traffic and no shutdown option
The solution
We applied the Elastomac hot-applied permanent repair system to both the pothole and the joint failure.
- A seamless, watertight bond across the joint to stop repeat cracking
- Full repair and white lining reinstated in the same shift
- About 3 hours on site
- Zero closures – the store traded as normal
- A permanent repair that breaks the recurring failure cycle
Results
The client prefers a permanent repair to temporary patching – and got one without closing the store.
- Permanent repairs are achievable within live retail environments
- Day-shift completion removes the need for night work or shutdowns
- Clients prefer permanent repairs to temporary patching
Frequently asked questions
Where was this elastomac permanent repair carried out?
Morrisons, Welwyn Garden City, for Associated Asphalt.
How long did the works take?
About 3 hours.
Why was this method used?
We applied the Elastomac hot-applied permanent repair system to both the pothole and the joint failure.
What was the result?
The client prefers a permanent repair to temporary patching – and got one without closing the store.